April 24, 2024
Floor plan
# Specification Details
1 Foundation and Super Structure RCC framed structure will stand on pile foundation/ RCC footing as per structural design.
2 Partition Wall 115mm peripheral and partition wall with adequate no. of strainer columns for structural safety.
3 Internal Finish Mono-colour finish over P.O.P and primer.
4 External Finish Weather proof paint.
5 Doors and Windows uPVC Windows/ Aluminium Windows (Premiere uPVC German technology on customers demand as extra cost for uPVC).
6 Flooring Vitrified floor tiles of ISI quality for all rooms.
7 Kitchen Polished marble slab on cooking area and glazed tiles on wall up to 600 mm above slab. 1 stainless still sink fitted at the slab along with water tap.
8 Toilet Antiskid tiles on the floor and ceramic tiles up to door height on the walls. Basins and water closets of reputed brands.
9 Electrical Adequate electric points in all rooms with fire resistant electric wire and ISI approved switches along with one fan one tube light in every habitable room and exhaust fan in kitchen.
10 Other facilities Provisions for split AC point at extra cost and prior intimation.
11 Lifts 6 passengers lift.
# Installment Rate (%)
1 Down Payment(On Booking) 10
2 1st Installment(On signing of Agreement) 20
3 2nd Installment(On casting of 1st Slab) 10
4 3rd Installment(On casting of 2nd Slab) 10
5 4th Installment(On casting of 3rd Slab) 10
6 5th Installment(On casting of 4th Slab) 10
7 6th Installment(On casting of 5th Slab) 10
8 7th Installment(On completion of Brick works) 10
9 8th Installment(POP finish) 5
10 9th Installment(Prior to hand Over) 5